Subscribe to Newsletter and Print Magazine
  • SYDNEY BUILD 2026 PREMIUM BANNER

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Classrooms powered by renewable energy to be trialled in NSW schools

31 Jan, 2018
renewable energy


School children across Australia could soon be taught in classrooms powered entirely by renewable energy as a result of the innovative ‘Hivve’ modular classroom, now being trialled in two New South Wales schools.

On behalf of the Australian Government, the Australian Renewable Energy Agency (ARENA) is providing Hivve Technology Pty Ltd with $368,115 in funding to pilot their modular classrooms in a school environment.

Known as the ‘Hivve’, the portable classroom incorporates solar PV generation, real time energy metering, CO2 metering, data capture and communications to actively manage energy demands and control indoor environment quality.

Each Hivve classroom has the potential to generate enough electricity to power itself and two other classrooms in the school.

A regular classroom can consume on average 3,800 KWh per year, but when a HIVVE classroom is in use, there is an estimated net energy generation of 7,600 KWh per year.

Ready for the start of 2018 school year this week, the two pilot classrooms are being trialled at St Christopher’s Catholic Primary School in Holsworthy in Sydney’s south western suburbs and at Dapto High School in Dapto where the performance of the Hivve classrooms will be monitored and evaluated over a 12 month period.

A prototype building built by Hivve Technology Pty Ltd has successfully demonstrated the functionality in a controlled environment and this will be the first time the Hivve classroom and technology has been trialled in a real school.

ARENA CEO Ivor Frischknecht said there was enormous potential for Australia’s public schools to not only educate on renewables, but also reduce their reliance on the grid.

“This is a great way to get the next generation involved in renewables at an early age and educate them as to what the positive benefits will be as Australia continues its shift towards a renewable energy future.”

“The success of the Hivve project could lead to a nation-wide adoption of the modular classrooms, reducing reliance on the grid and even providing a significant amount of electricity back to the NEM.” Mr Frischknecht said.

Hivve Director David Wrench said the Hivve Technology was conceived and designed to deliver sustainable solutions – both environmental and economic – to help meet Australia’s growing school infrastructure needs.

“We are very pleased to be partnering with ARENA on this exciting project. We have carefully designed every element of the Hivve classroom to create the best possible learning environment for students”, Mr Wrench said.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
14 Apr

WA invests $6M to grow capacity of community housing sector

14 Apr

Urban design a potential cure for Australia’s loneliness crisis

13 Apr

Michael Schaper appointed chair of Infrastructure WA

13 Apr

NSW ruling narrows misleading conduct in construction claims

08 Apr

AI-powered robots set to tackle road cracks with negligible human intervention

17 Apr

Finalised Barangaroo Cutaway becomes major cultural venue

15 Apr

Hurstville rises as Sydney’s latest vibrant landmark

14 Apr

Webuild project completes Caterina Tunnel excavation

14 Apr

International team to design Sydney cathedral precinct

13 Apr

Melbourne Airport Rail project moves forward with consortia shortlist

16 Apr

Predictive modelling tools boost building performance in future climates

15 Apr

Preconstruction planning for equipment screens avoids costly design changes

14 Apr

Delivering Under Pressure: Why Delivery Certainty Has Become Construction’s Defining Test

14 Apr

The uncomfortable truth dig sites and renovations keep revealing

14 Apr

How to overcome the biggest barriers to simple, sustainable construction

  • FCON 2026

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine
  • Queensland transport
  • ARBS

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required