Subscribe to Newsletter and Print Magazine
  • WEB - PREMIUM - FTI GROUP

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Sydney’s Greenwich Point Wharf upgrade begins with traditional smoking ceremony

27 Jun, 2024
Sydney's Greenwich Point Wharf upgrade begins with traditional smoking ceremony


Construction of the Greenwich Point Wharf upgrade has officially commenced, marked by a traditional Smoking Ceremony and Welcome to Country.

The new wharf design incorporates sustainability features and Connecting with Country elements, including permanent indigenous artworks.

These artworks were created in collaboration with Aboriginal artist Shane Youngberry, with storytelling contributions from Uncle Rodney Mason and Aunty Thelma Rudd.

The Greenwich Point Wharf upgrade will feature a new floating pontoon connected by an extended gangway, as well as a passenger lift and stairs.

These improvements aim to enhance safety and accessibility, providing equitable access from the street level and the bus stop directly to the wharf.

Steven Issa, Executive Director of Planning and Programs at Transport for NSW, acknowledged the community’s input during the design process.

“Following important feedback from the community and Lane Cove Council, we made some changes during the design phase, which included maximising weather protection,” Issa explained.

For this project, BESIX Watpac, the company responsible for delivering the upgrade, is collaborating with local marine contractor Polaris Marine Group. Stephen Richmond, General Manager of Polaris Marine Group, who expressed enthusiasm about the project, stating: “We look forward to delivering a new wharf design that increases functionality and access for passengers.”

The Greenwich Point Wharf will be closed for approximately eight months, from April 22 until late 2024, to accommodate the upgrade work.

This temporary closure is part of the broader effort to improve Sydney’s ferry infrastructure and enhance the overall public transport experience for commuters.

This project is part of Transport for NSW’s Safe Accessible Transport Program, aimed at making public transport more inclusive and user-friendly.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

City of Sydney seeks public input on Pyrmont-Ultimo planning overhaul

NSW cements Western Sydney Aerotropolis as a centre for industry and innovation

NSW’s Five Dock Spencer Street advances under new pathway

Sydney largest playground opens in Green Square

Construction begins on Melrose Park affordable housing project

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
21 Jul

TURNER fosters new connections for women in the built environment

16 Jul

Researchers trial breath test for silicosis detection

16 Jul

New AI standards set to reshape data centre construction

15 Jul

Pressure mounts for probe into construction corruption in Victoria

14 Jul

Queensland hits 100,000-home milestone with new investment

21 Jul

Construction underway on High Wycombe community sporting hub

21 Jul

MODEL sets ambitious low carbon housing target with Lithgow

17 Jul

NSW cements Western Sydney Aerotropolis as a centre for industry and innovation

17 Jul

Queensland unlocks housing in Julia Creek to meet critical minerals demand

17 Jul

Construction begins on Darwin student housing project

13 Jul

The future of self-healing concrete: Moving from lab to large-scale projects

01 Jul

The false choice in construction: Why ‘cheap’ and ‘sustainable’ shouldn’t be enemies

25 Jun

Negative Gearing Reforms Tipped to Shake Up Sydney Apartment  Supply

16 Jun

How GIS technology is revolutionising construction project tracking

11 Jun

Water defects drive 92% of building claims as regional housing ramps up

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required