Subscribe to Newsletter and Print Magazine
  • WEB - PREMIUM - FTI GROUP

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Sydney’s Greenwich Point Wharf upgrade begins with traditional smoking ceremony

27 Jun, 2024
Sydney's Greenwich Point Wharf upgrade begins with traditional smoking ceremony


Construction of the Greenwich Point Wharf upgrade has officially commenced, marked by a traditional Smoking Ceremony and Welcome to Country.

The new wharf design incorporates sustainability features and Connecting with Country elements, including permanent indigenous artworks.

These artworks were created in collaboration with Aboriginal artist Shane Youngberry, with storytelling contributions from Uncle Rodney Mason and Aunty Thelma Rudd.

The Greenwich Point Wharf upgrade will feature a new floating pontoon connected by an extended gangway, as well as a passenger lift and stairs.

These improvements aim to enhance safety and accessibility, providing equitable access from the street level and the bus stop directly to the wharf.

Steven Issa, Executive Director of Planning and Programs at Transport for NSW, acknowledged the community’s input during the design process.

“Following important feedback from the community and Lane Cove Council, we made some changes during the design phase, which included maximising weather protection,” Issa explained.

For this project, BESIX Watpac, the company responsible for delivering the upgrade, is collaborating with local marine contractor Polaris Marine Group. Stephen Richmond, General Manager of Polaris Marine Group, who expressed enthusiasm about the project, stating: “We look forward to delivering a new wharf design that increases functionality and access for passengers.”

The Greenwich Point Wharf will be closed for approximately eight months, from April 22 until late 2024, to accommodate the upgrade work.

This temporary closure is part of the broader effort to improve Sydney’s ferry infrastructure and enhance the overall public transport experience for commuters.

This project is part of Transport for NSW’s Safe Accessible Transport Program, aimed at making public transport more inclusive and user-friendly.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Catholic Healthcare to deliver 99 senior homes in Maroubra

Catholic Healthcare to deliver 99 senior homes in Maroubra

City of Sydney unveils $1B budget for infrastructure and services

TAFE fees frozen, construction courses become free

New $11M TAFE Centre of Excellence set to grow construction workforce in Sydney

Aurora development tops out in Manly

Aurora mixed-use waterfront development tops out in Manly

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
11 Jun

Steel market distortion and competition worsen as subsidies surge

09 Jun

Perth’s western suburbs to modernise century-old planning legislation

08 Jun

NSW land audit identifies underutilised sites to grow housing pipeline

08 Jun

NSW pushes modular technology to tackle housing crisis

04 Jun

Victoria introduces sweeping property reforms for townhouse owners, buyers and renters

11 Jun

Construction underway for Albury Entertainment Centre Convention Wing redevelopment

11 Jun

Stage one complete at Bendigo business park precinct

11 Jun

TW Projects expands into Melbourne with Rockbank project

11 Jun

New Plus Studio tool reveals greater potential for adaptive reuse in Melbourne

09 Jun

New South Wales backs modular construction to boost housing supply

11 Jun

Water defects drive 92% of building claims as regional housing ramps up

05 Jun

Provision of adequate site facilities key for worker health and safety

26 May

The three childcare centre design priorities owners and developers need to address

22 May

Grade control transitions from premium add-on to standard equipment

22 May

Rising costs are forcing Australian builders to reassess equipment ownership

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required