Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

National Museum of Australia launches environmental sustainability action plan

05 Jun, 2023
National Museum
The Acton waterfront in Canberra. Photo by Steve Tritton.

The National Museum of Australia has launched its inaugural environmental sustainability action plan, which commits it to reducing its carbon emissions to net zero by 2030.

The Museum has embraced both Federal and Australian Capital Territory government legislation and guidelines to achieve certified carbon-neutral status of its building and business practices by or before 2030.

Among the first steps the Museum has taken to reach its targets is acquiring electric vehicles, installing solar panels and reducing the use of utilities.

ACT Minister for Water, Energy and Emissions Reduction, Mr Shane Rattenbury said: “The launch of the National Museum of Australia’s environmental and sustainability action plan is a significant step towards addressing climate change at the community level. By committing to achieve net zero carbon emissions by 2030, the Museum demonstrates its dedication to taking action on climate change.

“By setting targets and taking action to reduce emissions, the Museum sets an example for other institutions to follow. This is the kind of leadership we need as we work together to create a zero emissions, environmentally conscious future,” Mr Rattenbury said.

National Museum Director, Dr Mathew Trinca, said: “The Museum takes great pride in setting out its vision of building audience capacity to sustain Australia’s rich natural environment and cultural heritage.

“Through this action plan, the Museum commits to achieving its goals of carbon-neutral certification, reducing its impact on the environment, and engaging audiences with knowledge to promote a sustainable future,” Dr Trinca said.

This year, electric vehicles will replace two of the Museum’s fleet of six internal combustion engine vehicles, with others to follow as the leases expire.

A 192kW solar panel system has recently been installed on the Museum building’s roof, which provides approximately 4.5 per cent of the building’s electricity requirement.

The Museum’s action plan aligns with the Powering Australia plan’s emissions reduction program, APS Net Zero 2030, which requires the Australian Public Service to reduce its greenhouse gas emissions to net zero by 2030.

The Museum’s plan also aligns with the United Nations Sustainability Development Goals, which seek internationally agreed outcomes in relation to sustainability.

While the Museum is subject to Federal legislation, its location within the ACT allows it to benefit from the ACT Government’s Waste Management Strategy, and electricity derived from 100 per cent renewable sources.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Wattle Grove over 55s lifestyle resort secures planning approval

Powerhouse Parramatta set for 2026 opening

Powerhouse Parramatta set for 2026 opening

NSW awards celebrate conservation and storytelling

Melbourne’s latest sustainable tower at Bourke Street tops out

Sustainability anchors Pyrmont Bridge East Refurbishment

Sustainability anchors Pyrmont Bridge East Refurbishment

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
06 Nov

Queensland opens $8.8M construction business grant program to cut red tape

06 Nov

WA government unveils high-density housing plan for METRONET precincts

05 Nov

CIOB global Art of Building winners 2026 revealed

04 Nov

ASI scheme to improve steel sustainability wins international award

04 Nov

Councils and local builder partner to accelerate project delivery in Adelaide

09 Nov

Construction starts on 60-unit affordable housing complex in Butler

09 Nov

Major Maitland precinct DA lodged by EXP Capital

05 Nov

Prefabricated Schofields terraces showcase modern methods of construction

04 Nov

Victoria unlocks land for 2,500 new homes at La Trobe University

03 Nov

Western Harbour Tunnel reaches milestone as tunnel boring machines near halfway point

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required