Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Amazing all-timber residence built using Glulam and CLT

08 May, 2019
Image of the project (supplied).

A one-of-a-kind residence utilising all-timber Glulam and Cross Laminated Timber (CLT) is currently under construction at Merrawarp Rd Ceres (near Geelong Victoria).

The concept design for the ‘Royd Clan’s House’ was partly inspired by the boulders and the remains of the previous house.

Architect, Nadine Samaha, from Level Architekture said she wanted to create a structure which emulated these boulders coming from the ground.

“Strong winds on the hill consolidated the idea of fragmenting the house in pavilion clusters which reduces the wind turbulence and appear as boulders,” she said.

“Scattered stones from the remains of the previous house are brought into the existing structure as support for internal stairs. This concept also responded to the need for playful architecture for the clients’ active young boys.”

The objective of using just timber provided a challenge for Nathan Benbow of Vistek engineers and Rob Mansell from Hyne Timber in the design of the house structure, which comprises Glulam portal frames arranged in one of the primary axes of each pavilion.

The floor and roof diaphragms as well as the inclined wall of each pavilion are constructed with CLT to create a shear wall perpendicular to the portal frames.

Glulam beams and CLT panels were fabricated with CNC machinery to ensure all elements could be assembled with a high degree of precision on-site, which is crucial for a structure with a unique and complex geometry.

The total volume of timber in the project is 40 cubic metres of Glulam and 180 cubic metres of CLT – which in Australian pine plantations will be re-grown in just 17 minutes.

 

The Ceres project will be a highlight of the Project Panel session program at the ‘Timber Offsite Construction’ conference in June. Introduction of building project discussions is a new feature at the event and offers an opportunity to engage with all the key participants in construction projects. Delegates will gain first-hand experience from design and construction professionals that demonstrate the high levels of expertise available for timber and mass wood buildings in Australia.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

GURNER unveils $1.75 billion Geelong luxury pier precinct

Lowe Living unveils completed Emerald Place development

Spectre secures approval for $25m Airport West development

New Arden Central precinct to house 10,000 residents

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
06 Nov

Queensland opens $8.8M construction business grant program to cut red tape

06 Nov

WA government unveils high-density housing plan for METRONET precincts

05 Nov

CIOB global Art of Building winners 2026 revealed

04 Nov

ASI scheme to improve steel sustainability wins international award

04 Nov

Councils and local builder partner to accelerate project delivery in Adelaide

05 Nov

Prefabricated Schofields terraces showcase modern methods of construction

04 Nov

Victoria unlocks land for 2,500 new homes at La Trobe University

03 Nov

Western Harbour Tunnel reaches milestone as tunnel boring machines near halfway point

27 Oct

NSW pledges massive $6.8b investment for South Coast rail line upgrade

26 Oct

GURNER unveils $1.75 billion Geelong luxury pier precinct

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required