Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Western Harbour Tunnel reaches milestone as tunnel boring machines near halfway point

03 Nov, 2026


Construction on Sydney’s first new road harbour crossing in more than 35 years is powering ahead, with the first of two massive tunnel boring machines (TBMs) set to reach the halfway mark in its journey from Birchgrove to Waverton this week.

The underground excavation crews beneath Waverton have completed two enormous underground receiving chambers, marking another critical milestone for the Western Harbour Tunnel project.

The newly finished chambers will act as the arrival destination for the twin TBMs, which are currently carving out the final 1.5-kilometre section of the tunnel beneath Sydney Harbour at depths of up to 50 metres.

Upon completing their underwater journey, the TBMs will break through into the purpose-built underground caverns, connecting the new harbour tunnels with the previously excavated 2.8-kilometre stretch running between Cammeray and Waverton.

Standing up to 23 metres high, 35 metres wide, and 34 metres long, the receiving chambers are a substantial engineering achievement.

Designed and excavated using specialised roadheaders, the space allows the southern hemisphere’s largest TBMs to be safely dismantled underground. Their massive cutterheads and shields will be detached, shifted sideways, and permanently sealed into the surrounding bedrock.

Once completed, the new connection will link motorists directly to WestConnex via the Rozelle Interchange, creating a major alternative route across the city.

New South Wales Minister for Roads Jenny Aitchison noted the scale of the ongoing engineering work deep below the harbour.

“The Western Harbour Tunnel is taking shape deep beneath Sydney harbour, and these two major milestones show just how much progress is being made on this once-in-a-generation project,” Aitchison said.

“As the first tunnel boring machine is reaching the halfway point beneath the harbour, crews on the North Shore have completed two enormous underground chambers ready to receive these engineering giants.”

Western Harbour Tunnel remains on track for completion in 2028, with projections indicating it will reduce traffic by 35 per cent on the Western Distributor, 20 per cent in the Sydney Harbour Tunnel, and 17 per cent on the Sydney Harbour Bridge.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
03 Nov

Property Council welcomes NSW’s major industrial planning reforms

03 Nov

Trust and early planning key to construction success, industry report finds

26 Oct

WA passes new payment protection laws for subcontractors

23 Oct

Major Subiaco wastewater upgrade to unlock 60,000 homes in Perth

22 Oct

Trade shortages persist across Australian residential markets

03 Nov

Western Harbour Tunnel reaches milestone as tunnel boring machines near halfway point

27 Oct

NSW pledges massive $6.8b investment for South Coast rail line upgrade

26 Oct

GURNER unveils $1.75 billion Geelong luxury pier precinct

23 Oct

Lowe Living unveils completed Emerald Place development

23 Oct

Spectre secures approval for $25m Airport West development

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required