Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

InfraBuild wins first 2032 Games-related steel contract amid Queensland boom

04 Sep, 2026



Steel manufacturing firm InfraBuild has secured the very first steel supply contract linked to the 2032 Brisbane Olympic and Paralympic Games, strengthening its foothold in Queensland amid an unprecedented AU$119 billion state construction boom.

Under the deal awarded by main contractor Hutchinson Builders, Australia’s sole producer of recycled reinforcing steel will supply locally made rebar for the AU$287.5 million revitalisation of the RNA Showgrounds.

The project forms part of a broader AU$3.5 billion investment in Athletes’ Villages, introducing a 20,000-seat main arena, upgraded grandstands, and a modernised horse pavilion.

The steel will be manufactured from local scrap using InfraBuild’s electric arc furnaces before undergoing processing at its state-of-the-art facility in Eagle Farm.

InfraBuild CEO Francisco Irazusta said the contract was a landmark achievement, while stressing the vital need to back Australian manufacturing over cheap overseas imports.

“We’re proud to have secured the first steel contract for a 2032 Games-related project and to see Australian-made reinforcing steel going into infrastructure that will showcase Queensland to the world,” Irazusta said.

“Queensland shouldn’t be building the 2032 Games with cheap steel imported from Asia. Chinese long steel exports have increased more than fourfold since early 2022. As a result, cheap Asian steel is flooding the market at the very time we should be backing Australian steelmaking, Australian jobs, and more resilient local supply chains.”

To meet surging statewide demand across housing, transport, and energy infrastructure, InfraBuild is rolling out significant regional investments.

The company plans to open a new 2,070-square-metre facility in Toowoomba by late 2027, operated by its subsidiary, the Australian Reinforcement Company (ARC).

Construction on the Toowoomba hub begins in late 2026, delivering an annual capacity of 9,000 tonnes of reinforcing steel.

Alongside upgrades to existing facilities in Hemmant and Eagle Farm, these expansions will boost InfraBuild’s Queensland capacity by nearly 60,000 tonnes a year and create 90 local jobs. The manufacturer aims to lift total furnace capacity to 1.8 million tonnes nationwide by 2030.

InfraBuild is Australia’s only domestic manufacturer of reinforcing steel. It operates 37 sites across Queensland and employs more than 930 people in the state.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Steel market distortion worsens amid subsidy surge

Australian Steel Institute criticises Productivity Commission over imported steelwork

European Commission plans tougher steel tariffs

European Commission plans tougher steel tariffs

VIC government's steel offshoring sparks industry outcry

Australia’s steel future hinges on containing energy costs

Kingspan Water Tanks

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
16 Sep

Australian steel body challenges Productivity Commission findings on import protections

16 Sep

Queensland releases roadmap to drive freight growth across state

15 Sep

Stanley’s Bond Store wins Master Builders Tasmania award

13 Sep

Fremantle bridge set for early completion with innovative building method

10 Sep

Drone surveys reveal hidden dangers on roads

16 Sep

Construction begins on luxury Solais Newstead apartments

15 Sep

WA children’s hospice prepares to welcome first families

15 Sep

Queensland boosts infrastructure investment to unlock more regional homes

15 Sep

Flood-damaged NSW roads to be rebuilt under new infrastructure program

14 Sep

Landcom achieves topping-out milestone for Lismore build-to-rent housing

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

24 Aug

Data helps identify building defect patterns to prevent future problems

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required