Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Work begins on $543M upgrades to Western Australia’s longest pipeline

06 Oct, 2026
plumbing and drainage


The Western Australian government has broken ground on a AU$543 million upgrade to the Goldfields and Agricultural Water Supply Scheme (GAWSS), Western Australia’s longest water pipeline.

Delivered by Water Corporation, the infrastructure project will secure reliable drinking water for more than 100,000 residents across the Goldfields and Wheatbelt regions. The scope of work includes replacing 44.5 kilometres along the 566-kilometre pipeline route and duplicating the Binduli Reservoir to boost total pipeline capacity by 10 per cent.

The steel pipes are being manufactured locally in Kwinana using Pilbara iron ore and Cockburn cement, with an engineered lifespan of up to 150 years. The project forms a central pillar of the state government’s Seven Cities vision, designed to expand regional infrastructure to support population growth and business investment in Kalgoorlie-Boulder and surrounding areas.

The construction phase is expected to create more than 330 jobs, while injecting AU$42.4 million directly into local businesses, including AU$14 million allocated specifically to Aboriginal enterprise engagement.

Premier Roger Cook stressed the long-term economic benefits of manufacturing key components within the state.

“By manufacturing the pipeline in WA, we’re backing local industry today, and with a lifespan of up to 150 years, we’re delivering the water security and economic foundations the Goldfields and Wheatbelt will rely on for generations to come,” Cook said.

Water Minister Daniel Pastorelli said modern engineering solutions will preserve the legacy of the scheme, originally constructed by C.Y. O’Connor between 1898 and 1903, while upgrading its capacity to meet future demand.

Meanwhile, Kalgoorlie MLA Ali Kent described the investment as a once-in-a-generation commitment to regional industry and residents.

The infrastructure upgrade will ensure the continuous supply of water from Mundaring Weir through to Kalgoorlie-Boulder, unlocking capacity for regional economic expansion.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

WA injects $4M to restart Cardup Brickworks and boost material supplies

New system delivers faster fairer housing approvals in NSW

WA raises social housing income eligibility limits

Work begins on WA's first children's hospice

WA children’s hospice prepares to welcome first families

Perth Film Studios construction reaches major milestone

Major social housing development provides huge boost to Perth

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
08 Oct

Victoria’s housing program reaches 15,000 fast-tracked approvals

02 Oct

Victoria expands scheme to subsidise ceiling insulation installations

02 Oct

Cambridge launches framework to boost construction productivity

01 Oct

Tasmania releases draft apartment code to streamline housing approvals

01 Oct

NSW declares 15 housing projects as State Significant to unlock 4,300 new homes

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

06 Oct

Work begins on $543M upgrades to Western Australia’s longest pipeline

06 Oct

Victoria approves over 1,000 new homes for former Oakleigh quarry site

01 Oct

Barwon Heads Road project moves into final stage

30 Sep

The Prescott development approved for Lindfield Upper North Shore

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required