Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

NSW unlocks land for 545 new homes in South West Sydney

23 Sep, 2026
Australia’s housing approvals surged but challenges remain


The New South Wales government has finalised planning controls for a major rezoning initiative in South West Sydney, unlocking 545 new homes just 400 metres from Warwick Farm Train Station and a short distance from Liverpool’s city centre.

The now-finalised controls cover the 3.2-hectare Mannix Parade Precinct, transforming the area into a mixed-tenure community.

Crucially, the project mandates that at least 30 per cent of all new dwellings will be dedicated to social and affordable housing in perpetuity, offering secure housing for local key workers and vulnerable residents.

The refined proposal follows extensive technical investigations and community consultations involving Liverpool City Council and state housing agency Homes NSW.

Although the total number of planned homes was scaled back from an initial 670 to 545, the precinct’s designated public open space was expanded by nearly 40 per cent to include a 2,500-square-metre public park alongside new pedestrian and cycling pathways. Building heights across the site will range from four to 11 storeys.

The rezoning was processed under the state’s Social and Affordable Housing Rezoning pathway, established to accelerate the delivery of government-backed housing projects.

Planning and Public Spaces Minister Paul Scully said: “Mannix Parade is a great example of well-planned infill development, putting more homes close to public transport, jobs, schools, health services and other infrastructure people rely on every day.

“We’ve increased the amount of open space provided by almost 40 per cent while still delivering around 545 new mixed tenure homes, including at least 30 per cent social and affordable housing.”

Housing and Homelessness Minister Rose Jackson added that the project ensures vulnerable community members gain access to key urban infrastructure.

“At least 30 per cent of the homes enabled by this proposal will be social and affordable housing, providing more options for people who need them most, including key workers,” Jackson said.

The precinct sits 1.1 kilometres from Liverpool Hospital, currently undergoing a $930 million health and academic precinct upgrade, and 950 metres from a new co-educational high school designed for up to 2,000 students.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

WA government unveils plans for affordable housing near new METRONET station

WA government unveils high-density housing plan for METRONET precincts

Trade shortages persist across Australian residential markets

Preconstruction planning for climate-resilient building upgrades: Australian best practices for 2026

Six design teams shortlisted for Sydney’s new Bays West suburb

NSW unlocks over 200 new homes in East Tamworth following land audit

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
06 Nov

Queensland opens $8.8M construction business grant program to cut red tape

06 Nov

WA government unveils high-density housing plan for METRONET precincts

05 Nov

CIOB global Art of Building winners 2026 revealed

04 Nov

ASI scheme to improve steel sustainability wins international award

04 Nov

Councils and local builder partner to accelerate project delivery in Adelaide

05 Nov

Prefabricated Schofields terraces showcase modern methods of construction

04 Nov

Victoria unlocks land for 2,500 new homes at La Trobe University

03 Nov

Western Harbour Tunnel reaches milestone as tunnel boring machines near halfway point

27 Oct

NSW pledges massive $6.8b investment for South Coast rail line upgrade

26 Oct

GURNER unveils $1.75 billion Geelong luxury pier precinct

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required