Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

UNSW advances education with new G25 development

06 Mar, 2026
UNSW advances education with new G25 development


UNSW Sydney has received State Significant Development (SSD) approval for a new 12-storey Education Building (G25).

Located on the eastern side of the Kensington campus, the 12-storey G25 building will deliver over 20,000 square metres of purpose-built teaching, learning, and research spaces.

It will also accommodate research and clinical facilities for the UNSW School of Psychology. Construction is now underway and is scheduled for completion in 2028.

UNSW Vice-Chancellor and President Professor Attila Brungs said the approval reinforces the University’s dedication to designing environments that inspire academic excellence and student success.

“The new G25 building is an investment in people – in our students, our educators and future generations,” Prof. Brungs said.

“By expanding our teaching capacity and creating inclusive, future-ready learning spaces, we are strengthening our ability to deliver accessible education that empowers students with the skills, knowledge and confidence to make a positive impact in the world.”

Designed to support contemporary learning modes, G25 will feature flexible classrooms, three large double-height teaching venues, informal study zones, and neurodiversity-friendly spaces that foster inclusion.

Landscaped terraces and a new café will complement these facilities, creating a welcoming environment for collaboration and community engagement.

Sustainability is at the core of G25’s design, with features focused on energy efficiency and active transport.

The building will include new bicycle parking and end-of-trip facilities, encouraging staff and students to choose greener commuting options.

Upgraded landscaping, mature tree planting, and expanded public spaces will enhance biodiversity and improve accessibility.

A significant upgrade to the Gate 11 precinct will create a new pedestrian-friendly campus entrance, with a plaza, improved walkways and stronger links to the Randwick Health & Innovation Precinct.

The project is part of UNSW’s broader Campus Development Plan, a long-term initiative reshaping learning, research, and student life across the campus.

UNSW has partnered with leading Australian firms, including Architectus, FDC, Arup, Capital Insight, Yerrabingin and Colliers Urban Planning to deliver the project, ensuring a balance of architectural innovation, sustainability, and community benefit at the heart of the University’s next generation of learning spaces.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Colliers launches leasing of UNSW Hub

Colliers launches leasing of UNSW health hub

UNSW Health Translation Hub opens

UNSW Health Hub completed ahead of opening

UNSW Health Translation Hub completed ahead of opening

AI-powered breath test offers hope for early silicosis detection

AI-powered test offers hope for early silicosis detection

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
09 Oct

Australia’s peak safety body backs $42.7M funding for free mandatory safety standards

08 Oct

Victoria’s housing program reaches 15,000 fast-tracked approvals

02 Oct

Victoria expands scheme to subsidise ceiling insulation installations

02 Oct

Cambridge launches framework to boost construction productivity

01 Oct

Tasmania releases draft apartment code to streamline housing approvals

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

06 Oct

Work begins on $543M upgrades to Western Australia’s longest pipeline

06 Oct

Victoria approves over 1,000 new homes for former Oakleigh quarry site

01 Oct

Barwon Heads Road project moves into final stage

30 Sep

The Prescott development approved for Lindfield Upper North Shore

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required