Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Prefabricated apartment build delivers 38 social homes in WA

13 Oct, 2026


A AU$23.5 million joint initiative between the Western Australian and federal governments has delivered 38 brand-new social housing units in North Coogee eight months faster than traditional construction timelines, thanks to innovative off-site manufacturing techniques.

The newly completed development features 12 one-bedroom, two studio, and 24 two-bedroom apartments.

Delivered by local Western Australian companies PARC Developments and Tyrone Group, the entire project took just 14 months from start to finish.

The significant time savings were achieved by utilising prefabricated bathroom pods and pre-assembled masonry wall panels.

Manufactured off-site at Tyrone Group’s facility in Neerabup while foundational siteworks were underway, the pre-built components were trucked directly to North Coogee.

This modern method dramatically streamlined on-site assembly while minimising noise and disruption for surrounding residents.

Tyrone Group is notably the first Australian company to produce masonry wall panels locally, boosting Western Australia’s advanced manufacturing sector and supporting local employment.

Supported by the federal government’s AU$2 billion Social Housing Accelerator Payment fund, the development forms part of the state’s broader commitment to address housing affordability.

The property will be managed by a community housing provider, with vulnerable community members, including seniors, single parents, and individuals escaping domestic violence, scheduled to move in later this year.

“The use of innovative technology demonstrates that we can deliver more homes, sooner, when we look beyond the traditional double brick builds,” said Housing and Works Minister John Carey.

Federal Member for Fremantle Josh Wilson praised the collaborative effort, noting that innovation is key to delivering much-needed affordable homes faster.

Fremantle MLA Simone McGurk also welcomed the project, emphasising its prime location near public transport and essential services in central Fremantle.

These 38 units add to more than 4,300 social homes delivered across Western Australia through the state government’s record $10.8 billion investment in housing measures since 2021.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

plumbing and drainage

Work begins on $543M upgrades to Western Australia’s longest pipeline

Laverton Hospital front render

New $67.6m Laverton Hospital construction complete

WA injects $4M to restart Cardup Brickworks and boost material supplies

New system delivers faster fairer housing approvals in NSW

WA raises social housing income eligibility limits

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
13 Oct

Queensland leads nation with record 52,500 houses under construction

10 Oct

Apartment solar sharing technology wins top Australian Good Design Award

09 Oct

Australia’s peak safety body backs $42.7M funding for free mandatory safety standards

09 Oct

Builders get reprieve as ATO postpones credit card ban

08 Oct

Victoria’s housing program reaches 15,000 fast-tracked approvals

13 Oct

Vacant Woolloomooloo site to deliver 15 new social homes in Sydney

13 Oct

Prefabricated apartment build delivers 38 social homes in WA

12 Oct

Construction begins on JLT’s new BAY360 community hub

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

08 Oct

Jordan’s $2.5b mineral railway breaks ground

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required