Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

New $67.6m Laverton Hospital construction complete

05 Oct, 2026
Laverton Hospital front render
An artist’s impression of the new Laverton Hospital

Construction of the new $67.6 million Laverton Hospital is now complete, marking a major milestone for healthcare in the Goldfields and ensuring more Western Australians can access the care they need regardless of where they live.

The WA Country Health Service is working to have the hospital operational for Laverton and surrounding residents this month.

The facility includes a modern emergency department equipped with telehealth technology, flexible overnight care beds and specialist spaces for visiting clinicians.

It will also host outpatient services, community and child health, mental health and allied health services, along with room for an onsite private GP clinic.

Construction was carried out by Western Australian builder ADCO Constructions Pty Ltd, a result Premier Roger Cook said had delivered benefits beyond the finished building.

“Importantly, this project has also supported local jobs and economic activity during construction, with Western Australian builder ADCO Constructions delivering this major piece of regional infrastructure,” said Cook.

The hospital forms part of the WA government’s record $5.5 billion health infrastructure program.

It was also supported by a $16.8 million contribution from the federal government’s Community Health and Hospitals Program, which helped bring the project to completion.

The new hospital is expected to reduce the distances patients and families in the region need to travel for treatment.

Laverton is a remote community in the Eastern Goldfields, and access to local emergency and outpatient care has been a long-standing priority for residents.

The telehealth capability of the emergency department will allow clinicians in Laverton to connect with doctors and specialists elsewhere, expanding the level of expertise available on site.

Overnight flexible care beds will allow patients to be treated and monitored locally rather than being transferred out of town where clinically appropriate.

The inclusion of space for visiting specialists and a private GP clinic is designed to broaden the range of services available in a single location.

Community and child health services will operate alongside mental health and allied health care, creating a central point for health support in the town.

Health Minister and Acting Health Infrastructure Minister Meredith Hammat said the facility would offer a comprehensive range of care for the local community, with the emergency department a key feature.

Goldfields-Esperance Minister David Michael said the project reflected the government’s focus on regional health, while Kalgoorlie MLA Ali Kent described the completed construction as an eagerly awaited milestone for the region.

The hospital is part of a broader program of health infrastructure works being delivered across the State, which the government says is aimed at providing hospitals, health services and healthcare jobs to communities from the metropolitan area to the regions.

With construction finished, attention now turns to the final stages of commissioning and the transition to full operations.

Once open, the hospital will provide Laverton and surrounding communities with a modern, locally accessible health service designed to meet the needs of the region for years to come.

Further details on the opening date and service arrangements are expected to be released by the WA Country Health Service as the hospital prepares to welcome its first patients.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Prefabricated apartment build delivers 38 social homes in WA

plumbing and drainage

Work begins on $543M upgrades to Western Australia’s longest pipeline

WA injects $4M to restart Cardup Brickworks and boost material supplies

New system delivers faster fairer housing approvals in NSW

WA raises social housing income eligibility limits

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
13 Oct

Queensland leads nation with record 52,500 houses under construction

10 Oct

Apartment solar sharing technology wins top Australian Good Design Award

09 Oct

Australia’s peak safety body backs $42.7M funding for free mandatory safety standards

09 Oct

Builders get reprieve as ATO postpones credit card ban

08 Oct

Victoria’s housing program reaches 15,000 fast-tracked approvals

13 Oct

Vacant Woolloomooloo site to deliver 15 new social homes in Sydney

13 Oct

Prefabricated apartment build delivers 38 social homes in WA

12 Oct

Construction begins on JLT’s new BAY360 community hub

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

08 Oct

Jordan’s $2.5b mineral railway breaks ground

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required