Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

New $14.8M tug facility to double capacity at Port of Esperance

22 Sep, 2026


Construction on a AU$14.9 million upgrade to marine infrastructure at the Port of Esperance is set to begin in the coming months, following the construction contract awarded for tug jetties.

Advanteering Civil Engineers has secured the contract to deliver the new purpose-built facility, drawing on its extensive experience with marine projects. The scope of works includes the supply and installation of new piles, bollards, and fenders, replacing existing service jetties that have reached the end of their operational life.

The upgrade will double the port’s tug berthing capacity, expanding space from two to four tugboats. The new jetties are vital to supporting the towage vessels that assist safe shipping movements at the key southern trade hub.

Demolition of the existing jetties is scheduled to begin in January, with full construction expected to wrap up in the first half of 2027.

“The new tug facility at the Port of Esperance will create additional capacity for tugs within the Port of Esperance, a critical southern gateway for regional trade,” said Ports Minister Stephen Dawson said.

“Upgrading facilities at WA ports is vital to ensuring they continue to connect our regional miners and producers to global opportunities without interruption.”

Southern Ports COE Keith Wilks noted that the port handled more than 180 vessel calls last year, underscoring the need for reliable infrastructure.

“It’s critical that the Port’s tugs have a suitable place to be moored between movements so that they are ready to work with our marine team and visiting vessel masters around the clock,” Wilks said.

Advanteering Civil Engineers Managing Director Tom Cunningham expressed excitement about delivering the essential infrastructure.

“We understand this is a critical piece of infrastructure at the Port and we’re looking forward to delivering a new fit-for-purpose facility that will meet the current and future needs of Southern Ports,” Cunningham said.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
22 Sep

New trade remedies watchdog to protect Australia’s industry competitiveness

18 Sep

NSW rolls out smart rental bonds scheme statewide

18 Sep

WA raises social housing income eligibility limits

18 Sep

Construction and mining sectors lead male suicide rates

16 Sep

Australian steel body challenges Productivity Commission findings on import protections

22 Sep

New $14.8M tug facility to double capacity at Port of Esperance

17 Sep

Construction begins on 72-storey Atlas Melbourne tower

17 Sep

Macquarie Park student tower passes halfway construction milestone

16 Sep

Construction begins on luxury Solais Newstead apartments

15 Sep

WA children’s hospice prepares to welcome first families

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

24 Aug

Data helps identify building defect patterns to prevent future problems

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required