Follow us:
Subscribe to our newsletter or print magazine

logo

  • News
  • Projects
  • Grand Designs
  • Mega Structures
  • Events
  • Products and Services
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Grand Designs
  • Mega Structures
  • Events
  • Products and Services
  • Online Magazine
  • Advertise
  • Contact
  • SDAU extension welcomed by WA property industry
  • Survey shows extent of gender-based adversity in construction sector
  • Australian cities out-of-step on walkability, according to transport study
  • Driving sustainability through green construction

Multiplex tops out NEXTDC’s data centre in Sydney

04 May, 2022
116
NEXTDC's


Multiplex has reached a major construction milestone on Stage 1 of NEXTDC’s S3 data centre, ‘topping out’ the structure in Artarmon on Sydney’s lower North Shore.

Designed by architects Greenbox, NEXTDC’s new S3 data centre comprises approximately 26,770 square metres of data halls and ancillary infrastructure over eight storeys, delivering more than 20,000 square metres of IT space.

The building now stands nine levels above ground (approximately 50 metres in height) and caters to the growing need for data storage, cloud and interconnection capability as digital transformation accelerates.

Bolstering the local Sydney market, the S3 project has employed a total of 2042 workers to date.

“We are delighted to continue our ongoing collaboration with NEXTDC, reaching this fantastic milestone on Sydney’s newest data centre following the successful delivery of S2 Sydney and P2 Perth,” said David Ghannoum, Multiplex Regional Managing Director NSW.

S3 Sydney is NEXTDC’s third and largest data centre in Sydney and directly interconnects to the existing S1 and S2 Sydney data centres and into NEXTDC’s broader national digital infrastructure platform.

It comprises a range of amenities for tenants including comfortable workspaces, collaboration zones, car parking and over 4,000 square metres of critical office space.

“This is an important milestone as S3 is a crucial digital infrastructure asset for NSW. We couldn’t be happier with construction progress to date, despite the adverse health and weather conditions which our project team has navigated safely and effectively. As our largest facility to date, and the first of our third-generation data centres, S3 is on track to deliver critical digital capability and further strengthen cloud access in the region, on time,” said Simon Cooper, NEXTDC Chief Operating Officer.

The structure is predominantly a ‘hybrid’ scheme using a combination of reinforced and post tensioned concrete and structural steel K frame for lateral bracing, in lieu of the more conventional concrete shear walls.

NEXTDC and Multiplex are implementing environmentally sustainable design features including a reduced energy consumption cooling system, incorporating ‘free cooling’ to further reduce power consumption and optimise efficiency levels.

Targeting the same 5-Star rating for energy efficiency as NEXTDC’s existing facilities, S3 is designed and constructed to Uptime Tier IV standards. Tier IV certification recognises the facility’s complete fault tolerance and emphasises the exemplary levels of reliability and resilience, providing the maximum amount of redundancy for power and cooling.

Construction of Stage 1 of NEXTDC’s S3 data centre is on track for completion in the second half of 2022.

Related Articles

fine

Multiplex fine over Canberra fatality manifestly inadequate

Fragrance

Fragrance Group’s ‘wave-like’ tower delivered to Melbourne CBD

Bourke Street

New $950M Bourke Street tower completed

Brookfield Place Sydney

Brookfield Place Sydney reaches practical completion

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

all news all projects

Latest Posts

  • Latest News
  • Latest Projects
20 May

SDAU extension welcomed by WA property industry

20 May

Survey shows extent of gender-based adversity in construction sector

20 May

Australian cities out-of-step on walkability, according to transport study

19 May

Driving sustainability through green construction

18 May

Land sales hampered by skills and materials shortages, according to UDIA WA

20 May

Lendlease unveils its newest community in Brisbane’s Moreton Bay region

20 May

Princeton completes transformative Villawood residential project

19 May

Brand new arts precinct in Australian school first

19 May

Plans for fast-rail interchange in Western Sydney on the right track

19 May

First of Australia’s tallest twin towers in Melbourne completes construction

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to our newsletter or print magazine

Associations

Our Titles

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2022 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required