Subscribe to Newsletter and Print Magazine
  • WEB - PREMIUM - FTI GROUP

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Largest single QLD road project Coomera Connector to support 1000 jobs

28 Mar, 2023
A render of the Coomera River Bridge, viewed from the north bank.

The $2.16-billion Coomera Connector (Second M1) is Queensland’s biggest single road project and will support 1,000 jobs during construction.

Major construction is underway on the 16-kilometre Coomera Connector Stage 1, creating a ‘second M1’ to remove up to 60,000 local trips a day from the M1 Pacific Motorway, south of Brisbane.

The first sod was turned recently, marking the start of main construction on Stage 1 North, between Shipper Drive, Coomera and Helensvale Road, Helensvale.

Early works to prepare for construction have been ongoing since November 2021.

The start of construction comes as the Australian Government approved the project’s Public Environment Report (PER), giving the green light for the project to progress to major construction.

The report sets out measures to reduce and mitigate the project’s impact on the environment, including offsetting and enhancing koala habitats at nearby properties in Pimpama and Tabooba.

The Coomera Connector will change how Gold Coast residents get around and improve journeys between the growing Coomera and Nerang communities.

It will also mean more reliable travel times between Brisbane and the Gold Coast by alleviating congestion on the M1.

A new, 1-kilometre-long, Coomera River bridge crossing is a key feature of the first package, along with a four-metre-wide shared active transport path.

The first stage of the project will be delivered in three construction packages:

  • Stage 1 North: Shipper Drive, Coomera to Helensvale Road, Helensvale (now underway)
  • Stage 1 Central: Helensvale Road, Helensvale to Smith Street Motorway, Molendinar (expected to start later this year)
  • Stage 1 South: Smith Street Motorway, Molendinar to Nerang-Broadbeach Road, Nerang (in design).

The final design for Stage 1 North includes improvements made by contractor Acciona Georgiou Joint Venture (AGJV), such as to the location of the shared path’s rest area and upgrades to surrounding local roads at the interchanges.

Construction notices will be distributed as the project progresses, giving residents, motorists and boaties more detail on how and where work will be carried out.

The Second M1 will open progressively from 2025.

The Australian and Queensland governments have each committed $1.08 billion to the $2.16 billion to plan and build Coomera Connector Stage 1 between Coomera and Nerang.

It is estimated to support an average of 1,000 direct jobs over the life of the project.

Queensland Premier Annastacia Palaszczuk said this was a critical infrastructure project for the South East as the population of the Gold Coast continued to grow.

Palaszczuk said: “Our Government’s support of the Coomera Connector is backing 1,000 local jobs, and a strong pipeline of investment in the region for years to come.

“As one of the fastest growing regions in the country, this vital road project will get Queenslanders home safer and sooner than ever before.

“This investment is on top of the more than $5.5 billion we’ve already jointly invested upgrading the M1 since 2015.”

Queensland’s Federal Minister for Infrastructure, Transport, Regional Development and Local Government Catherine King said: “The Coomera Connector is a boon for southeast Queenslanders – it means less time stuck in traffic and more time spent with loved ones enjoying Queensland’s great lifestyle.

“We know congestion is a significant issue for the region – it’s a drain on the economy and frustrating for families, which is why we’re getting on with delivering this critical piece of infrastructure.

“With major construction can now underway, works will continue to ramp up over the coming months as this new motorway starts to come to life.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

VIC government commits to North East Link Project despite cost challenges

Pilbara national park to receive road and lookout upgrades - Karijini National Park.

Pilbara national park to receive road and lookout upgrades

CPB Contractors

Freeway of the future receives Australia’s top construction industry award

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
10 Aug

NSW passes laws for 10-year insurance policy for apartment defects

10 Aug

Freecity Construction wins NAWIC industry challenge award

06 Aug

NSW passes landmark building reforms to accelerate modular housing

06 Aug

WA launches second stage of 10-year homelessness action plan

04 Aug

NSW outlines 20-year plan for housing and growth in Illawara-Shoalhaven

08 Aug

New 99 Green St. Cremorne sets new standard for city-fringe workplaces

07 Aug

Sydney hospitals gain new family accommodation support

06 Aug

Construction starts on Melbourne north-west dual health hub

04 Aug

Demolition works mark new chapter for Central Dandenong

04 Aug

WA health infrastructure boost begins with Rockingham Hospital master plan

07 Aug

What’s in your building materials? The health crisis construction workers aren’t talking about

13 Jul

The future of self-healing concrete: Moving from lab to large-scale projects

01 Jul

The false choice in construction: Why ‘cheap’ and ‘sustainable’ shouldn’t be enemies

25 Jun

Negative Gearing Reforms Tipped to Shake Up Sydney Apartment  Supply

16 Jun

How GIS technology is revolutionising construction project tracking

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required