Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Final stage of Upper West Side delivered

15 Nov, 2016
Upper West Side


The $160 million Tower Three (Stage 4) of Far East Consortium’s Upper West Side at 33 Rose Lane in Melbourne’s CBD was recently delivered by Multiplex, marking the completion of the $550 million project.

Designed by architects Cottee Parker, Tower Three (Stage 4) spans 52-levels and includes 641 apartments, as well as a large retail arcade, communal pool and gymnasium.

Upper West Side comprises 2,207 apartments across four towers and is one of Australia’s largest inner city developments capable of housing approximately 4,000 people.

Completion of the podium landscape area to Tower Three is expected by mid-November and will make the combined area of all towers one of the largest raised green roofs in the southern hemisphere. Being almost an acre in size, the landscape zones provide residents with unique features such as a rock climbing facilities, all while being surrounded by botanically inspired plants and some 20-25 year old trees.

“We are delighted to have completed the final stage of Upper West Side. Throughout all four stages of the project, we have drawn on our extensive experience in delivering high rise towers amidst a busy CBD environment,” said Mr Graham Cottam, Regional Managing Director of Multiplex Victoria.

Staged handovers posed a challenge to construction, with residents moving into a portion of the building whilst minor construction continued on the upper levels.

A large protection deck was also designed and installed, cantilevering off Tower Three to protect neighbouring buildings.

Some 4,500 people worked on-site during the overall construction of the four tower project, spanning close to six years of construction in total.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Construction begins on 72-storey Atlas Melbourne tower

Planning approval confirmed for new $2 billion Bankstown Hospital as demolition well underway

Planning approval confirmed for new $2 billion Bankstown Hospital as demolition well underway

Sydney Airport advances major terminal expansion project

Sydney Airport advances major terminal expansion project

Multiplex unveils state-of-the-art $855m John Hunter Health Precinct

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
20 Nov

WA proposes modernised park home laws to increase housing supply

20 Nov

Australia’s gender pay gap falls below 20% for the first time

19 Nov

Australian government launches investigation into alleged dumping of timber

19 Nov

NSW introduces new safety code to protect workers from deadly dust diseases

18 Nov

Queensland enacts new construction productivity code after CFMEU inquiry report

17 Nov

Construction begins on $14.3M Gillen Oval Multi-Sport Precinct in NT

16 Nov

Construction begins on $18.5M Springbrook Park redevelopment

11 Nov

Queensland funding unlocks more than 760 new homes in the Redlands

10 Nov

WA’s largest timber-framed apartment building opens for residents

09 Nov

Construction starts on 60-unit affordable housing complex in Butler

13 Nov

Rebuild, remanufacture or replace? How to decide on a high-hour machine

13 Nov

Free TAFE is filling construction courses, but will it fill worksites?

11 Nov

Could better building design reduce future maintenance burdens?

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required