Subscribe to Newsletter and Print Magazine
  • WEB - PREMIUM - FTI GROUP

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Construction of WA’s biggest water pipeline passes halfway mark

17 Jun, 2026
plumbing and drainage


Construction of one of the largest water pipelines ever built in Western Australia has reached its halfway mark, another step forward for the state government’s AU$2.8 billion Alkimos Seawater Desalination Plant.

More than 17 kilometres of the 33.5km underground trunk main has now been laid. Once completed in 2027, the massive corridor will link the future desalination plant to Water Corporation’s Wanneroo Reservoir, integrating it into a network that supplies drinking water to more than 2.5 million people.

With an internal diameter of 1.6 metres, the pipeline is among the largest ever constructed in the state and has been engineered to support future expansions of the desalination facility.

The pipeline highlights the state government’s Made in WA manufacturing push. Fabricated locally by Steel Mains in Kwinana, the steel, cement-lined pipe sections are manufactured using Pilbara iron ore and Cockburn cement.

Crews have installed nearly 1,600 individual pipe sections ranging from six to 12 metres in length, with the largest segments weighing up to nine tonnes each.

Western Australian Premier Roger Cook said: “This pipeline is the perfect example of my government’s Made in WA plan.

“Not only will it be built with products and materials sourced from local businesses, it will also be a key part of our Alkimos desalination plant, which when built will support hundreds of jobs.”

The pipeline’s massive size also brings environmental advantages, as the wider diameter reduces the friction and energy required to pump water, cutting greenhouse gas emissions by 21 per cent compared to narrower alternatives.

Water Minister Don Punch emphasised that the project is vital for climate resilience.

“This milestone marks the halfway point in delivering one of the largest water pipelines built in WA and is a critical step in securing our state’s water future,” Punch said.

“It is a critical part of the AU$2.8 billion Alkimos Seawater Desalination Plant project that will strengthen the resilience of our water network as demand grows and our climate continues to change.”

The broader AU$2.8 billion Alkimos project supports over 1,500 jobs and will initially supply 50 billion litres of drinking water annually.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

New system delivers faster fairer housing approvals in NSW

WA launches second stage of 10-year homelessness action plan

WA reopens $120M Infrastructure Fund to fast-track housing delivery

Construction commences at $950.6m New Mandurah Hospital

Construction commences at New Mandurah Hospital in WA

building engineers

WA reveals sweeping planning reforms to accelerate housing supply

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
10 Aug

NSW passes laws for 10-year insurance policy for apartment defects

10 Aug

Freecity Construction wins NAWIC industry challenge award

06 Aug

NSW passes landmark building reforms to accelerate modular housing

06 Aug

WA launches second stage of 10-year homelessness action plan

04 Aug

NSW outlines 20-year plan for housing and growth in Illawara-Shoalhaven

11 Aug

NSW to rezone Shellharbour to unlock 11,700 new homes

11 Aug

Sydney Town Hall to get major modernised plaza redesign

08 Aug

New 99 Green St. Cremorne sets new standard for city-fringe workplaces

07 Aug

Sydney hospitals gain new family accommodation support

06 Aug

Construction starts on Melbourne north-west dual health hub

07 Aug

What’s in your building materials? The health crisis construction workers aren’t talking about

13 Jul

The future of self-healing concrete: Moving from lab to large-scale projects

01 Jul

The false choice in construction: Why ‘cheap’ and ‘sustainable’ shouldn’t be enemies

25 Jun

Negative Gearing Reforms Tipped to Shake Up Sydney Apartment  Supply

16 Jun

How GIS technology is revolutionising construction project tracking

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required