Subscribe to Newsletter and Print Magazine

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Cedar Woods completes Douglas Apartments in Melbourne

09 Sep, 2026
Douglas Apartments


Cedar Woods has completed and handed over Douglas Apartments in Noble Park, delivering 97 apartments and six ground-floor retail tenancies in one of Melbourne’s established south-eastern activity centres.

The development was delivered in partnership with community housing provider HousingFirst, the Victorian government and the federal government.

HousingFirst will own and operate the building for social housing, while the Commonwealth and Victorian governments supported the project through the Housing Australia Future Fund (HAFF) and the Social Housing Growth Fund (SHGF).

Located beside Noble Park Train Station, Douglas Apartments provides new housing within walking distance of public transport, shops and established services, while adding residential and retail activity to the wider Noble Park precinct.

The completed building brings together social housing and retail space on a site that previously served as surplus commuter parking.

The project comes at a time of continued demand for community housing in Victoria and demonstrates how government, community housing providers and the private sector can work together to deliver new homes and positive community outcomes.

Cedar Woods worked with its project partners and coordinated with numerous stakeholders to convert the underused site into housing in an activity centre close to transport.

Balmain & Co was engaged as the project’s builder and delivered the building alongside the Cedar Woods project team, consultants, subcontractors and trades.

Cedar Woods Managing Director Nathan Blackburne said the handover reflected both the housing outcome and the partnership required to achieve it.

“This project is about something tangible: 97 completed homes in a well-connected part of Melbourne,” said Blackburne.

Blackburne said the project’s location was an important part of the outcome.

“Putting new housing beside public transport and established services makes practical use of well-connected land,” he said.

He noted that providing residents with a place to live was the most important outcome of the development, while the six ground-floor retail tenancies would also add activity to the wider Noble Park precinct.

The retail component is expected to contribute to street-level activation in the area, complementing the new residential population moving into the building.

The project stands as an example of how surplus or underused government-owned land, such as former commuter car parks, can be repurposed to deliver housing outcomes without displacing existing transport infrastructure.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Safer Melbourne intersection opens seven months early

Construction now underway on AURA tower in Melbourne

Construction now underway on AURA tower in Melbourne

New system delivers faster fairer housing approvals in NSW

WA raises social housing income eligibility limits

Construction begins on 72-storey Atlas Melbourne tower

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
10 Oct

Apartment solar sharing technology wins 2026 Australian Good Design Award of the Year

09 Oct

Australia’s peak safety body backs $42.7M funding for free mandatory safety standards

08 Oct

Victoria’s housing program reaches 15,000 fast-tracked approvals

07 Oct

AIBS urges protections for Victorian surveyor independence

02 Oct

Victoria expands scheme to subsidise ceiling insulation installations

12 Oct

Construction begins on JLT’s new BAY360 community hub

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

07 Oct

London Place to advance Campsie town centre transformation

06 Oct

Work begins on $543M upgrades to Western Australia’s longest pipeline

06 Oct

Victoria approves over 1,000 new homes for former Oakleigh quarry site

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

07 Sep

How heavy vehicle telematics can track unsafe habits on jobsites

25 Aug

Who will still be prepared to build Australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required