Subscribe to Newsletter and Print Magazine

Build Australia: A construction Magazine logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

WorkSafe to target falling objects on Victorian construction sites

18 Feb, 2019
Common causes for falling objects include gaps between safety screens, missing kick or toe boards on scaffolding, and materials coming loose while being lifted.


WorkSafe inspectors will be focusing on the risks of falling objects when they visit Victorian building sites over the next few weeks.

Falling objects are a leading cause of death and serious injury in the construction industry and pose a risk not only to workers but to people in streets near work sites.

According to WorkSafe, there has been five deaths and 721 injuries caused by falling objects at construction sites over the past five years.

In January alone, there was an incident involving falling objects at a Southbank site where a piece of timber fell 22 floors after it snapped in half while being lifted to a loading bay. At another site, a piece of MDF sheeting fell through an open window and 63 floors to the ground on Little Latrobe Street.

Thankfully no one was injured in these two incidents, but in September 2018 a 48-year-old man died and another worker was seriously injured after they were struck by a kibble full of concrete which fell from a crane at a Box Hill construction site.

WorkSafe Executive Director of Health and Safety Julie Nielsen said even a small object can cause serious injuries when falling from a great height.

“Every year WorkSafe is notified of hundreds of incidents involving falling objects, which are not only dangerous for workers, but also for members of the public passing by construction sites,” she said.

“Loads being lifted through the air must also be properly secured, and as we saw last year, the consequences can be tragic when a crane drops its load and there are workers below.”

“Risk control measures for falling objects are well known so there is no excuse for employers failing to implement them,” said Ms Nielsen.

Employers and site duty holders are being encouraged to prevent falling objects by:

  • Eliminating the risk through the off-site assembly of equipment that would otherwise be performed at an elevated edge.
  • Using containment systems or securing objects through substitution, isolation or engineering controls.
  • Using guardrail systems that incorporate mesh infill panels and kickboards.
  • Isolating the risk with barricades or fencing to create exclusion zones at ground level.
  • Implementing engineering controls such as perimeter safety screens, overhead protection gantries, enclosed perimeter scaffolding, and restraining loose material.
  • Administrative controls such as lines markings and signage to advise lanyard systems are to be used on tools or to monitor the possibility of windy weather.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Builders get reprieve as ATO postpones credit card ban

Cambridge launches framework to boost construction productivity

Construction and mining sectors lead male suicide rates

Construction begins on 72-storey Atlas Melbourne tower

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
15 Oct

Queensland Parliament passes reforms to support first home buyers

14 Oct

Queensland plumber wins $1.9M in Australia’s largest asbestosis settlement

14 Oct

Councils demand policy shift for Outer Western Sydney

14 Oct

Tasmania launches new website for 24/7 access to housing support

13 Oct

Planners, architects call for ongoing funding for Victorian government architect 

15 Oct

NSW unlocks over 200 new homes in East Tamworth following land audit

13 Oct

Vacant Woolloomooloo site to deliver 15 new social homes in Sydney

13 Oct

Prefabricated apartment build delivers 38 social homes in WA

12 Oct

Construction begins on JLT’s new BAY360 community hub

08 Oct

New $1.2B wastewater facility unlocks 140,000 homes in Western Sydney

15 Oct

The Mitchell’s Causeway rebuild — a showcase of heritage protection and resilience

15 Oct

How extreme heat is reshaping construction safety in Australia

29 Sep

System 600 and the race to standardise Australian prefab

16 Sep

Creating pathways into construction with initiatives that attract new talent

16 Sep

The hidden equipment cost destroying Australian construction margins

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required