Subscribe to Newsletter and Print Magazine
  • WEB - PREMIUM - FTI GROUP

logo

  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Trending
  • Events
  • Business Insight
  • Online Magazine
  • Advertise
  • Contact
  • Australia’s steel future hinges on containing energy costs

Double Diamond trellis security doors

1300838259
trellis@trellisdoors.com
Visit website

ATDC’s Double Diamond  mobile trellis door leads the market  offering unique advantages to any other available barrier system.

With the pitch between the steel cross members being so tightly interwoven together, the Double Diamond satisfies the requirements for both the “Foothold Aperture’’ provision of the Australian Standards AS4687-2007  Temporary Fencing and Hoarding as well as the Simulated Climbing Test. It also complies, in certain circumstances with the Australian Standards’ Dynamic Impact test.

The barriers are available ex-stock in standard heights of 2m or 2.5m in a satin black or pearl white powdercoated finish

Ideal applications include to secure temporary tenancies, kiosks,, mall walkways and shopping centre foodcourts, entertainment venues, warehouse loading docks, sporting venues and to protect employees from dangerous machinery. OH+S compliant and independently tested for safe operation.

A full 12 month commercial warranty applies to materials and parts.

For further information visit ATDC’s website

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Imported Chinese windows and doors pose compliance safety risks

Fire Security Expo

Fire Security Expo

Cognitec – Trusted face recognition technology

Anti-dumping measures vital to fair trade in Australia

Anti-dumping measures vital to fair trade in Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • News
  • Projects
  • Trending
21 Jul

TURNER fosters new connections for women in the built environment

16 Jul

Researchers trial breath test for silicosis detection

16 Jul

New AI standards set to reshape data centre construction

15 Jul

Pressure mounts for probe into construction corruption in Victoria

14 Jul

Queensland hits 100,000-home milestone with new investment

21 Jul

Construction underway on High Wycombe community sporting hub

21 Jul

MODEL sets ambitious low carbon housing target with Lithgow

17 Jul

NSW cements Western Sydney Aerotropolis as a centre for industry and innovation

17 Jul

Queensland unlocks housing in Julia Creek to meet critical minerals demand

17 Jul

Construction begins on Darwin student housing project

13 Jul

The future of self-healing concrete: Moving from lab to large-scale projects

01 Jul

The false choice in construction: Why ‘cheap’ and ‘sustainable’ shouldn’t be enemies

25 Jun

Negative Gearing Reforms Tipped to Shake Up Sydney Apartment  Supply

16 Jun

How GIS technology is revolutionising construction project tracking

11 Jun

Water defects drive 92% of building claims as regional housing ramps up

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe Newsletter and Print Magazine

Associations

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required